Author Index

A

  • Abbasiparizi, Saeid A Bender’s Decomposition Algorithm for Multi-objective Hub Location Problem Considering Stochastic Characteristics [Volume 48, Issue 2, 2014, Pages 243-255]
  • Abdollahzade, Majid Analyzing the Relationship between Contractor’s Qualification Measures and Project Quality in Research Projects: a Case Study [Volume 48, Issue 2, 2014, Pages 151-166]
  • Abooie, M. H. A Simulation-optimization Approach for Replenishment Planning and Shelf Space Allocation in Retail Industry under Zone- and Stock-dependent Demand [Volume 48, Special Issue, 2014, Pages 55-62]
  • Aghdasi, M. Application of Value Stream Mapping for Waste Reduction in Make-to-order Environment (An Action Research in a Commercial Printing Company) [Volume 48, Special Issue, 2014, Pages 111-121]
  • Aghdasi, Mohammad Robust Economic-Statistical Design of Control Charts - A Case Study in Automotive Industry [Volume 48, Issue 2, 2014, Pages 229-241]
  • Akbaripour, H. A Hybrid Artificial Neural Network for Selecting Product Investment Solution [Volume 48, Issue 1, 2014, Pages 51-65]
  • Akbaripour, Hossein Designing an Expert System for Management of Crowding and Overcrowding in Emergency Departments [Volume 48, Issue 2, 2014, Pages 281-292]
  • Akbary, A. A Novel Hybrid Model for Loan Allocation in Banking Investment Projects (Case Study: Bank Toseeye Taavon) [Volume 48, Issue 1, 2014, Pages 95-108]
  • Amin Naseri, MohammadReza Designing an Expert System for Management of Crowding and Overcrowding in Emergency Departments [Volume 48, Issue 2, 2014, Pages 281-292]
  • Amin-Naseri, M.R. A Hybrid Artificial Neural Network for Selecting Product Investment Solution [Volume 48, Issue 1, 2014, Pages 51-65]
  • Aminnayeri, M. Change Point Estimation in the Mean of Polynomial Profiles under Drift [Volume 48, Special Issue, 2014, Pages 63-70]
  • Aminnayeri, Majid A Bender’s Decomposition Algorithm for Multi-objective Hub Location Problem Considering Stochastic Characteristics [Volume 48, Issue 2, 2014, Pages 243-255]
  • Arkat, J. Network Location Problem for Two Congestible Facilities Considering Impatient Customers [Volume 48, Issue 1, 2014, Pages 13-22]
  • Asadpoor, A. A Decision Making Model to Select Business Intelligence Systems by Using Grey Theory (Technical note) [Volume 48, Issue 1, 2014, Pages 73-82]
  • Asgarinezhad, Abbas Performance Evaluation of Mazandaran Water and Wastewater by Data Envelopment Analysis and Artificial Neural Network [Volume 48, Issue 2, 2014, Pages 201-213]
  • Ayoubi, M. Change Point Estimation in the Mean of Polynomial Profiles under Drift [Volume 48, Special Issue, 2014, Pages 63-70]
  • Azadeh, A. Implementation of Particle Swarm Algorithm in Optimization Approach Using Simulation [Volume 48, Issue 1, 2014, Pages 1-11]

B

  • Babaei, M. S. Pricing and Inventory Decisions of Deteriorating Complementary Products [Volume 48, Issue 1, 2014, Pages 83-94]
  • Baradaran Kazemzadeh, Reza Robust Economic-Statistical Design of Control Charts - A Case Study in Automotive Industry [Volume 48, Issue 2, 2014, Pages 229-241]
  • Barzinpour, F. Forecasting Effects of Scenarios of Subsides Removal on Residential Electricity Consumption by Artificial Neural Networks [Volume 48, Special Issue, 2014, Pages 83-90]
  • Bashiri, Mahdi A Bender’s Decomposition Algorithm for Multi-objective Hub Location Problem Considering Stochastic Characteristics [Volume 48, Issue 2, 2014, Pages 243-255]
  • Behdad, Kian Designing a Residential Valuation Model through Analytic Hierarchy Process [Volume 48, Issue 2, 2014, Pages 167-176]
  • Bozorgi-Amiri, A. A Hub Location Model with Hierarchical Allocation and Limited Demand for Post Network [Volume 48, Issue 1, 2014, Pages 37-50]
  • Bozorgi-Amiri, A. A location Model for Blood Donation Camps with Consideration of Disruption [Volume 48, Special Issue, 2014, Pages 33-43]

E

  • Eshgarf, Reza Identification of Factors Affecting the Privatization of Iran's Gas Refining Industry; an Integrated Approach Delphi- DEMATEL: Parsian Gas Refinery Co. [Volume 48, Issue 2, 2014, Pages 137-150]
  • Eslami, A.A. A Scenario-Based Model for Redundancy Allocation with Choice of Redundancy Strategies [Volume 48, Special Issue, 2014, Pages 91-98]
  • Evaz Abadian, Farshid A Bi-objective Model for a Flowshop Scheduling Problem with Availability Constraint of Machines [Volume 48, Issue 2, 2014, Pages 189-200]

F

  • Fallah Nezhad, M. S. A Simulation-optimization Approach for Replenishment Planning and Shelf Space Allocation in Retail Industry under Zone- and Stock-dependent Demand [Volume 48, Special Issue, 2014, Pages 55-62]
  • Fallah Sanami, Sahar Particle Swarm Optimization Algorithm for Integrated Lot-sizing and Scheduling in Flowshop Production Environment [Volume 48, Issue 2, 2014, Pages 215-228]
  • Farsi, M.A. A Scenario-Based Model for Redundancy Allocation with Choice of Redundancy Strategies [Volume 48, Special Issue, 2014, Pages 91-98]
  • Farzaneh, Mandana Designing a Residential Valuation Model through Analytic Hierarchy Process [Volume 48, Issue 2, 2014, Pages 167-176]
  • Feizi, K. A Decision Making Model to Select Business Intelligence Systems by Using Grey Theory (Technical note) [Volume 48, Issue 1, 2014, Pages 73-82]

G

  • Ghandehari, M. Optimal Location of Passive Defense Facilities through Game Theory [Volume 48, Special Issue, 2014, Pages 19-32]
  • Ghazavi, E. A Simulation-optimization Approach for Replenishment Planning and Shelf Space Allocation in Retail Industry under Zone- and Stock-dependent Demand [Volume 48, Special Issue, 2014, Pages 55-62]
  • Ghorbani, B. Capacitated Multi-depot Vehicle Routing Problem with Inter-depot Routes [Volume 48, Special Issue, 2014, Pages 11-18]

H

  • Hashemi, Sara Designing an Expert System for Management of Crowding and Overcrowding in Emergency Departments [Volume 48, Issue 2, 2014, Pages 281-292]
  • Hashemifar, M. Measuring Supply Chain Flexibility using Fuzzy AHP and Fuzzy TOPSIS (Case study: Clothing Industry) [Volume 48, Special Issue, 2014, Pages 1-10]
  • Hassani Doughabadi, M. A Multi-objective Model to Optimize Gate and Counters Assignment to Arrival Flights (Case study: Imam Khomeini Airport) (Technical note) [Volume 48, Issue 1, 2014, Pages 67-72]
  • Hosseini, M. A New Approach to Customer Segmentation in the Fixed-line Telecom Using RFM Model [Volume 48, Issue 1, 2014, Pages 23-36]

I

  • Iranmanesh, Seyed Hossein Analyzing the Relationship between Contractor’s Qualification Measures and Project Quality in Research Projects: a Case Study [Volume 48, Issue 2, 2014, Pages 151-166]
  • Isaai, Mohammad taghi Designing a Residential Valuation Model through Analytic Hierarchy Process [Volume 48, Issue 2, 2014, Pages 167-176]
  • Isvand, F. A New Approach to Customer Segmentation in the Fixed-line Telecom Using RFM Model [Volume 48, Issue 1, 2014, Pages 23-36]

J

  • Jalili Bolhassani, S. Capacitated Multi-depot Vehicle Routing Problem with Inter-depot Routes [Volume 48, Special Issue, 2014, Pages 11-18]
  • Jamali Firoozabadi, K. A Multi-objective Model to Optimize Gate and Counters Assignment to Arrival Flights (Case study: Imam Khomeini Airport) (Technical note) [Volume 48, Issue 1, 2014, Pages 67-72]

K

  • Karimi, H. Capacitated Multi-depot Vehicle Routing Problem with Inter-depot Routes [Volume 48, Special Issue, 2014, Pages 11-18]
  • Karimi, S. Forecasting Effects of Scenarios of Subsides Removal on Residential Electricity Consumption by Artificial Neural Networks [Volume 48, Special Issue, 2014, Pages 83-90]
  • Keramati, Abbas Developing a Product Recommender System: Designing a Hybrid Model Using Data Mining Techniques [Volume 48, Issue 2, 2014, Pages 257-280]
  • Khaleghi, Roshanak Developing a Product Recommender System: Designing a Hybrid Model Using Data Mining Techniques [Volume 48, Issue 2, 2014, Pages 257-280]

L

  • Lotfi, M. An Expert System for Identification of Forecasting Model for Time Series [Volume 48, Special Issue, 2014, Pages 71-82]
  • Lotfi, M. M. A Simulation-optimization Approach for Replenishment Planning and Shelf Space Allocation in Retail Industry under Zone- and Stock-dependent Demand [Volume 48, Special Issue, 2014, Pages 55-62]

M

  • Maboudian, Y. Business Continuity Management in Iran- A Survey Research [Volume 48, Special Issue, 2014, Pages 99-110]
  • Mehmanchi, E. A Model to Solve Project Scheduling and Staff Assignment Problems [Volume 48, Special Issue, 2014, Pages 45-54]
  • Mina, Hassan Developing a New Approach for Product Performance Evaluation Based on Balanced Scorecard: An empirical study of a Dairy Company [Volume 48, Issue 2, 2014, Pages 177-188]
  • Mirzamohammadi, Saeed Identification of Factors Affecting the Privatization of Iran's Gas Refining Industry; an Integrated Approach Delphi- DEMATEL: Parsian Gas Refinery Co. [Volume 48, Issue 2, 2014, Pages 137-150]
  • Mohammadi, B. Change Point Estimation in the Mean of Polynomial Profiles under Drift [Volume 48, Special Issue, 2014, Pages 63-70]
  • Monshi, F. Joint Scheduling and Available-to-Promise calculation in Make-to-Forecast Production Systems [Volume 48, Special Issue, 2014, Pages 123-129]
  • Mousavizadeh, R. Optimal Location of Passive Defense Facilities through Game Theory [Volume 48, Special Issue, 2014, Pages 19-32]

N

  • Naseri, P. Project Risk Assessment Model Using Multi-Objective Decision-Making Approach (case study: the earth dam project Asalooye) [Volume 48, Issue 1, 2014, Pages 125-135]
  • Nasrollahi, Meisam Developing a New Approach for Product Performance Evaluation Based on Balanced Scorecard: An empirical study of a Dairy Company [Volume 48, Issue 2, 2014, Pages 177-188]
  • Nikbakhsh, E. A Memetic Algorithm for Designing a Capacitated Hub Network under Demand Uncertainty and Disruption [Volume 48, Issue 1, 2014, Pages 109-123]
  • Nilipour Tabatabaei, A. Project Risk Assessment Model Using Multi-Objective Decision-Making Approach (case study: the earth dam project Asalooye) [Volume 48, Issue 1, 2014, Pages 125-135]
  • Nojavan, M. A Novel Hybrid Model for Loan Allocation in Banking Investment Projects (Case Study: Bank Toseeye Taavon) [Volume 48, Issue 1, 2014, Pages 95-108]
  • Nojavan, M. Measuring Supply Chain Flexibility using Fuzzy AHP and Fuzzy TOPSIS (Case study: Clothing Industry) [Volume 48, Special Issue, 2014, Pages 1-10]

O

  • Omrani, H. A location Model for Blood Donation Camps with Consideration of Disruption [Volume 48, Special Issue, 2014, Pages 33-43]

P

  • Pashapour, Sh. Implementation of Particle Swarm Algorithm in Optimization Approach Using Simulation [Volume 48, Issue 1, 2014, Pages 1-11]
  • Pourreza, S. A Hybrid Artificial Neural Network for Selecting Product Investment Solution [Volume 48, Issue 1, 2014, Pages 51-65]

R

  • Rabani, M. Joint Scheduling and Available-to-Promise calculation in Make-to-Forecast Production Systems [Volume 48, Special Issue, 2014, Pages 123-129]
  • Rafiei, H. Joint Scheduling and Available-to-Promise calculation in Make-to-Forecast Production Systems [Volume 48, Special Issue, 2014, Pages 123-129]
  • Ramezanian, Reza Particle Swarm Optimization Algorithm for Integrated Lot-sizing and Scheduling in Flowshop Production Environment [Volume 48, Issue 2, 2014, Pages 215-228]
  • Rashidi Komijan, A. A Multi-objective Model to Optimize Gate and Counters Assignment to Arrival Flights (Case study: Imam Khomeini Airport) (Technical note) [Volume 48, Issue 1, 2014, Pages 67-72]
  • Razavi, H. An Expert System for Identification of Forecasting Model for Time Series [Volume 48, Special Issue, 2014, Pages 71-82]
  • Razmi, Jafar Developing a New Approach for Product Performance Evaluation Based on Balanced Scorecard: An empirical study of a Dairy Company [Volume 48, Issue 2, 2014, Pages 177-188]
  • Rezaeian, Javad Performance Evaluation of Mazandaran Water and Wastewater by Data Envelopment Analysis and Artificial Neural Network [Volume 48, Issue 2, 2014, Pages 201-213]
  • Rezaei Malek, Mohammad A Bi-objective Model for a Flowshop Scheduling Problem with Availability Constraint of Machines [Volume 48, Issue 2, 2014, Pages 189-200]
  • Rezaie, K. Business Continuity Management in Iran- A Survey Research [Volume 48, Special Issue, 2014, Pages 99-110]
  • Ronaghi, M.H. A Decision Making Model to Select Business Intelligence Systems by Using Grey Theory (Technical note) [Volume 48, Issue 1, 2014, Pages 73-82]

S

  • Sadeghi, Kh. Application of Value Stream Mapping for Waste Reduction in Make-to-order Environment (An Action Research in a Commercial Printing Company) [Volume 48, Special Issue, 2014, Pages 111-121]
  • Safaei, Abdolsattar Robust Economic-Statistical Design of Control Charts - A Case Study in Automotive Industry [Volume 48, Issue 2, 2014, Pages 229-241]
  • Sajadi, Seyed Jafar Identification of Factors Affecting the Privatization of Iran's Gas Refining Industry; an Integrated Approach Delphi- DEMATEL: Parsian Gas Refinery Co. [Volume 48, Issue 2, 2014, Pages 137-150]
  • Sarajian, A. A Hub Location Model with Hierarchical Allocation and Limited Demand for Post Network [Volume 48, Issue 1, 2014, Pages 37-50]
  • Setak, M. Capacitated Multi-depot Vehicle Routing Problem with Inter-depot Routes [Volume 48, Special Issue, 2014, Pages 11-18]
  • Seyed-esfahani, M. A Scenario-Based Model for Redundancy Allocation with Choice of Redundancy Strategies [Volume 48, Special Issue, 2014, Pages 91-98]
  • Shadrokh, Sh. A Model to Solve Project Scheduling and Staff Assignment Problems [Volume 48, Special Issue, 2014, Pages 45-54]
  • Shafiei Nikabadi, Mohsen Particle Swarm Optimization Algorithm for Integrated Lot-sizing and Scheduling in Flowshop Production Environment [Volume 48, Issue 2, 2014, Pages 215-228]
  • Shakhsi Niaei, Majid Analyzing the Relationship between Contractor’s Qualification Measures and Project Quality in Research Projects: a Case Study [Volume 48, Issue 2, 2014, Pages 151-166]
  • Shiri, H. Implementation of Particle Swarm Algorithm in Optimization Approach Using Simulation [Volume 48, Issue 1, 2014, Pages 1-11]
  • Shokri, Ali Designing an Expert System for Management of Crowding and Overcrowding in Emergency Departments [Volume 48, Issue 2, 2014, Pages 281-292]
  • Sobhani, Fateme Analyzing the Relationship between Contractor’s Qualification Measures and Project Quality in Research Projects: a Case Study [Volume 48, Issue 2, 2014, Pages 151-166]

T

  • Taleizadeh, A. Pricing and Inventory Decisions of Deteriorating Complementary Products [Volume 48, Issue 1, 2014, Pages 83-94]
  • Tavakkoli Moghaddam, Reza A Bi-objective Model for a Flowshop Scheduling Problem with Availability Constraint of Machines [Volume 48, Issue 2, 2014, Pages 189-200]
  • Teimury, E. Measuring Supply Chain Flexibility using Fuzzy AHP and Fuzzy TOPSIS (Case study: Clothing Industry) [Volume 48, Special Issue, 2014, Pages 1-10]
  • Torkestani, S. A Hub Location Model with Hierarchical Allocation and Limited Demand for Post Network [Volume 48, Issue 1, 2014, Pages 37-50]

Y

  • Yousefi, O. Project Risk Assessment Model Using Multi-Objective Decision-Making Approach (case study: the earth dam project Asalooye) [Volume 48, Issue 1, 2014, Pages 125-135]

Z

  • Zamani, Sh. Network Location Problem for Two Congestible Facilities Considering Impatient Customers [Volume 48, Issue 1, 2014, Pages 13-22]
  • Zegordi, S. H. A Memetic Algorithm for Designing a Capacitated Hub Network under Demand Uncertainty and Disruption [Volume 48, Issue 1, 2014, Pages 109-123]
  • Zendehdel, M. A location Model for Blood Donation Camps with Consideration of Disruption [Volume 48, Special Issue, 2014, Pages 33-43]